問題詳情
7.Assume that a machine cycle consists of three phase: fetch, decode, and execute; besides, thetime to execute each phase is T. Then how long do we need to execute n instructions whenusing the pipelining technique? Note that we assume that these n instructions are independent.
(A) 3nT,
(B) nT,
(C) n +2T,
(D) (n + 2)T.
參考答案
答案:[無官方正解]
難度:計算中-1
書單:沒有書單,新增