30. Before unloading the hatches only the surveyor is present.(A) close (B) open (C) secure (D) lash
31. 此艘船舶包裝容量是多少?(A) What is the bale capacity of the vessel? (B) What is the grain capacity of the v
32. The term of “ETA” means that:(A) Established Time of Arrival. (B) Estimated Time of Arrival. (C)
35. Which global satellite system is primarily used for communication purpose?(A) GPS (B) INMARSAT (
40. “Avessel is floating, not controlled and without a clearly determinable direction” is defined as
9. What is the advance and distances in a crash-stop?(A) moving (B) transfer (C) transit (D) crossin
16. Cargo is an arrangement of the ship showing the cargo position in the holds.(A) distribution (B)
18. When the light of a buoy or a lighthouse is inoperative, it should be remarked byin the chart. (