問題詳情

【題組】10.Construction of the new highway system _______ completed on time if more workers had been hired.
(A)needs to be
(B)would have been
(C)will be
(D)should have

參考答案

答案:B
難度:適中0.553398
統計:A(17),B(57),C(20),D(9),E(0)

用户評論

小刺客 湯瑪斯】評論

would haven been