問題詳情

5. If everything is on _____ , the construction work can be completed by the end of December as expected.
(A) rule
(B) battle
(C) temple
(D) schedule

參考答案

答案:D
難度:非常簡單0.918
書單:沒有書單,新增

用户評論

【用戶】Karen

【年級】大三上

【評論內容】If everything is on ☆☆☆☆☆☆☆☆ , ...

【用戶】Hi World

【年級】高二上

【評論內容】單字題If everything is on schedule, the construction work can be completed by the end of December as expected.如果一切按計劃進行,工程可以在12月底如期完成。(A) rule (v.) 統治;裁決;(n.) 規則(B) battle (v.) 與...作戰;(n.) 戰鬥;爭論(C) temple (n.) 廟宇,寺廟;神殿(D) schedule (v.) 安排;將……列入計畫(或時間)表;(n.) 清單;目錄;時間表;課程表英文7000單字表:https://hiworldwelcome.blogspot.com/2021/12/7000.html