3.PERT (Project Evaluation and Review Technique)
4.PV (Planned Value)
5.EV (Earned Value)
6.AC (Actual Cost)
7.SPI (Schedule Performance Index)
8.CV (Cost Variance)
9.六個標準差
10.衡平原則
12.決策數
13.魚骨圖(特性要因圖)
14.內部報酬率(IRR)
15.建築資訊模型(BIM,Building Information Modeling)
16.統包
17.BOT (Build Operate and Transfer)
18.回收年限法
19.資源拉平(ResourceLeveling)
20.PCM (Professional Construction Management)
一、字彙填空 (共 20 分,每題 2 分)1.__________ S______s does not always come easily, so don’t give up.
2.__________ Alison’s greatest a______t as a student was winning a scholarship (獎學金) to continue her
3.__________ Diode and Annie did not r______e that it was already midnight.
4.__________ Andy was rude, so Anna’s parents had n______e feelings to him.
5.__________ I tried to i______e the noise outside so that I could study, but it was not easy.
6.__________ It’s not fair (公平) to j______e a person by his or her appearance (外表).
劇作家提出「第四面牆」的說法,下列描述何者正確:(A)佈景的一種(B)環形舞台的轉化(C)促使劇場風格朝向象徵主義(D)演員在舞台上表演時,無視於觀眾的存在
1.有某種診斷方法,依過去的經驗知道患癌症的人,經過檢驗後發現有癌症的可能性為0.9;不患癌症的人,經過同樣的檢驗後發現有癌症的可能性為0.04。假設一群人有5%的人患有癌症,現從此群人中任選一人而加